(996afd7) Monitor several boards in the tui as tabs, and bump to 0.9.0
`worklane tui` takes any number of paths, each resolved to the first `.worklane` at or above it the way the working directory always was. With more than one board there is a tab per project plus an `all` tab merging them, and `tab`/`shift+tab` between them. The selection moves onto `Tab`: sharing one column and card index across projects would point it at whatever unrelated ticket sat in the same place. The merge is sorted through `by_priority_then_title`, now exported, rather than concatenated, so its order does not depend on the order of the arguments. On the merge a card and the overlay border name the project after the id, since across boards seven characters of uuid are not an address. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
c606b5ba43
commit
e6fe51e31e
+890
-212
File diff suppressed because it is too large
Load Diff
Reference in New Issue
Block a user