(8cc254c, 47aa0fe, a1dbd60) Fix the documented examples and the add tool schema

Three doc tickets in one commit, since two of them are the same check: run
everything the docs claim and see what fails.

8cc254c: the add example in the kanban skill passed -t twice, once where -g for
tags was meant, and gave -p three bare positional values instead of three flags.
Clap rejected it with exit 2, reproduced verbatim. Rewritten, with a line saying
why -t is not tags and why each step needs its own -p, since the example alone
does not explain the trap. The "--due (or --due)" filler is gone; --due and
--priority have no short form and now say so.

a1dbd60: only title is required in the add schema now. The other six fields were
unmarked, so the model had to invent a value for every field on every ticket.
The other four tool schemas were checked and are already right: ls is fully
optional, and the required arguments on show, mv and comment are genuinely
required. Every add field was already guarded in execute, so an omitted field
adds no flag.

47aa0fe: the README row it describes was already fixed in passing by ddbd45e,
which rewrote it for the priority work. "ls --status" appears nowhere. What was
left was the second criterion, and running every example turned up a different
problem: the 141 exit code documented for a truncated pipe only happens when the
output exceeds the 64 KiB a pipe holds. A short listing lands in the buffer
whole and reports 0. That was my own wording from b28ddb9 and it is now precise.

Every example in both files was run against the built binary, with real ids
substituted where they use placeholders, and the four documented exit codes were
measured rather than assumed.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
Ansho Rei
2026-08-21 01:18:36 +02:00
co-authored by Claude Opus 5
parent 39ee86e308
commit 6c43e62a4b
3 changed files with 26 additions and 9 deletions
@@ -35,12 +35,15 @@ Add a new ticket to the backlog.
- `--acceptance` (or `-a`): Acceptance criteria (repeat flag for each criterium)
- `--plan` (or `-p`): Implementation plan steps (repeat flag for each step)
- `--tags` (or `-g`): Tags (comma-separated)
- `--due` (or `--due`): Due date in YYYY-MM-DD format
- `--due`: Due date in YYYY-MM-DD format. No short form
- `--owner` (or `-o`): Owner name
- `--priority`: Priority level, 1 (most urgent) to 5 (least). Unset if omitted
- `--priority`: Priority level, 1 (most urgent) to 5 (least). Unset if omitted. No short form
Tags are `-g`, not `-t`: `-t` is the title, and passing it twice is an error. Each
plan step needs its own `-p`, since a bare value after one is not a second step.
```bash
worklane add -t "Implement login" -d "Add user login page" -t login,auth -p "Design UI" "Build backend" "Write tests" --due 2026-06-01 --owner "ilya"
worklane add -t "Implement login" -d "Add user login page" -g login,auth -p "Design UI" -p "Build backend" -p "Write tests" --due 2026-06-01 --owner "ilya"
```
When there's multiple acceptance criteria, add each using a separate `--acceptance` or `-a` flag.