(daa0e79) Validate the due date at parse time, and bump to 0.13.3
A clap value_parser beside priority_level rather than a check inside cmd_add, so a bad date is a usage error with nothing written at all rather than written and then rejected. On set --due as well as add --due, from one definition. The planning skill sets dates through set and never through add, so validating only the command that files a ticket would have left the path the validation exists to protect still accepting "next friday". The shape is checked before chrono sees it. %Y-%m-%d accepts an unpadded 2026-8-9, which would be stored as typed and sort before 2026-10-01. Strict on the way in, tolerant on the way out: util::due_date still cuts a datetime down to its date, since a file written earlier can hold one. PLAN.md told the planner the value was not validated. That is corrected, and the guard test that failed on the edit now pins the half of the warning that is still true: a date cannot be cleared, only replaced. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
7a0dd625ce
commit
3d6a74bc53
@@ -7,7 +7,7 @@ Worklane is a local Kanban flow for agentic software development.
|
||||
|---------|-------------|
|
||||
| `worklane` or `worklane tui [path...]` | Opens the board: four status columns, redrawn when the tree changes. Read only. Opens on backlog, committed and reviewing; `d` shows or hides done, whose count stays in the footer either way. Arrows or `hjkl` to move, `enter` for detail, `pgup`/`pgdn` to scroll an open ticket, `q` to quit. Each path opens the first `.worklane` at or above it, the working directory by default. Several paths are monitored together, as a tab per project plus an `all` tab that merges them, with `tab` and `shift+tab` between them |
|
||||
| `worklane init` | Creates `.worklane/` with backlog, committed, reviewing, done directories |
|
||||
| `worklane add` | Creates a ticket in backlog with `--title`, `--description`, `--acceptance`, `--plan`, `--tags`, `--due`, `--owner`, `--priority` flags |
|
||||
| `worklane add` | Creates a ticket in backlog with `--title`, `--description`, `--acceptance`, `--plan`, `--tags`, `--due`, `--owner`, `--priority` flags. `--due` takes `YYYY-MM-DD` and refuses anything else at parse time |
|
||||
| `worklane ls [status]` | Lists tickets, sorted by priority then title. Optional positional status, and `--priority <1-5>` |
|
||||
| `worklane show <id>` | Shows ticket by UUID prefix (4+ chars), title substring, or filename substring |
|
||||
| `worklane mv <id> --status <target> [-f]` | Moves ticket between statuses. Default: forward only, one stage at a time. `-f` bypasses both restrictions |
|
||||
|
||||
Reference in New Issue
Block a user